cliente-ikeda

Ikeda Empresarial

cliente-ikeda

The Ikeda Empresarial is present on the market since 1945, working on farm products development, giragrill and aironflex.

Master Ambiental provided environmental consultancy, elaborated and implemented a solid waste management plan (PGRS).


Know more about Master

cliente-odebrecht-2

Odebrecht

cliente-odebrecht-2

Odebrecht hired Master Ambiental services to implement the concept of sustainable working sites in the highway Jundiaí-Itatiba, administrated by the Concessionária Rota das Bandeiras.foto-de-artesp.sp.gov.br

The proposal for sustainable working site includes three phases:

  1. Diagnose and adjustments, concerning energy usage, water and solid waste generation;
  2. Diagnose, with CDP methodology;
  3. Proposal of actions that can be differential in sustainability during the highway administration.

 


Know more about Master Ambiental

 

Cataratas JL

Cataratas JL Shopping Mall

Cataratas JLThe Cataratas JL Shopping Mall is one of the enterprises of construction company JL. In this project, Master Ambiental has been hired to carry out the following services:

  • EIV – neighborhood impact study;
  • PGRCC – Construction solid waste management plan;
  • Environmental licensing.

 


 

 

Know more about Master Ambiental

prefeitura-maua

Mauá da Serra City Hall

logo-maua-serraWith 8.555 inhabitants (IBGE, 2010), the city of Mauá da Serra was consulted by our company for the implementation of Coopermauá – solid waste cooperative of Mauá da Serra.

The project was carried out in accordance with the guidelines of the new national solid waste policy (Lax 12.305/2010) and the awareness of the population about how to separate waste by means of education campaigns and communication. In addition to manage the implementation of the selective waste collection system, Master held an environmental friendly organic composting system.

Formed by recyclable materials pickers and low-income people, the cooperative has contributed to the generation of new jobs and improved the life quality of the collectors.


Know more about Master

novo-logo-duke

Duke Energy

cliente-duke-energy

The electric company Duke Energy International Geração Paranapanema has 2.241 MW of installed capacity, spread over eight hydroelectric power plants along 900 km of the Paranapanema River.
usina-chavantes

Master Ambiental has been hired to perform diagnostics on environmental quality around Rosana and Chavantes dams. Among the services, Master provided:

  • Floristic survey and vegetation monitoring around the Chavantes hydroelectric plant reservoir;
  • Evaluation if the previous reforestation actions carried out;
  • Fauna and flora survey and monitoring, in order to ensure environmental health and legality of the environmental projects of the Chavantes and Rosana power plants, covering 620 km2.

banner-jardim-botanico-duque-2-3Master Ambiental also elaborated and coordinated an environmental education plan in the Londrina Botanical garden, sponsored by Duke Energy for the Secretary of State and the Environmental and Water Resources – SEMA. Repair and improvements were made for public reception, which made possible the opening.

The environmental education aims to arouse the reflection on the public and encourage attitudes and behaviors on behalf of environmental conservation, it consist on a new visitors center, which was renovated and equipped with audiovisual room.


Know more about Master

VIAPAR

VIAPAR-RODOVIAS INTEGRADAS DO PARANÁ SA

Viapar manages 546.53 kilometers of highways in Paraná, and its granting is for 24 years.

The company has six toll stations, which are in Arapongas, Mandaguari, Presidente Castelo Branco, Floresta, Campo Mourão and Corbélia. The company also has seven operational bases, six of which are next to the tolls and one in Ubiratã, 2 fixed scales, 1 in Nova Esperança and Peabiru.
viapar-foto

Master Ambiental provided the following services:

  • Environmental control plan (PCA), necessary for obtaining the installation license by the Environmental Institute of Paraná (IAP), for the construction works in the highway BR 376.
  • Floristic inventory required for obtaining authorization for vegetation suppression.

 


Know more about Master

cliente-triunfo-constutora

Econorte

ECONORTE - AP1

The highway network administrated by Econorte coverts 341 km, divided into five segments, three state highways and two nationals: PR-323, PR-445, PR-090 and BR-369, BR-153.

These highways segments connects fifteen cities in the north of Paraná. The company operates three toll plazas located in Jacarezinho, Jataizinho and Sertaneja.

Master Ambiental has been hired by Econorte for:

  • Preliminary environmental impacts study for a base environmental licensing by the Environmental Institute of Paraná (IAP) of the Northern Londrina Boundary Highway. With 30 km, the highway will connect Ibiporã to Cambé avoiding urban area;cliente-pr-445
  • Environmental management during the highway PR-445 construction and duplication between Cambé and Tiradentes Avenue in Londrina;
  • Environmental control plan of highway PR-445, between km 87-97;
  • Renewal of the PR-445 installation license;
  • Treatment and final disposal diagnose of sanitary waste of eight operational bases and three toll plazas on BR-369, BR-153 and BR-323.
  • Elaboration of hydrological study to determine flow rates that contributes to erosion on highway PR-862.
  • Water resources granting of five wells located at the support bases of Sertaneja, Sertanópolis, Jataizinho, Cornélio Procópio and Cambará – PR.

Know more about Master Ambiental

ECOCATARATAS

Ecocataratas

ECOCATARATAS

The highway BR-277 is an important drainage rout that crosses Paraná, connecting Mato Grosso do Sul, the largest grains producer in Brazil, to the Paranaguá harbor. In addition, the highway is one of the main roads to the Iguaçu Falls, and to others countries in Latin America, through the Paraná border with Paraguay and Argentina.

Master Ambiental provided the following services for Ecocataratas:

Highway BR-277

Km 731-344, between Foz do Iguaçu – PR and Guarapuava:

  • Environmental noise report;
  • Natural light measurement at the toll plazas, SAU’s, scales, duplicating works and headquarters.

Km 643-660, between Matelândia and Céu Azul. Km 584-595 and Km 584-569, in Cascavel:

  • Floristic survey;
  • License for vegetation removal in the area;

Environmental licensing for km 569 duplication, between toll plaza and Iguaçu Falls:

  • Duplication monitoring;
  • Environmental programs report;
  • Environmental report;
  • Environmental consultancy for a flooding drainage system in São Miguel do Iguaçu – PR.

Studies on the identification and implementation of devices for environmental accidents prevention in 281 km on highway, between the towns of Foz do Iguaçu and Guarapuava.


Know more about Master Ambiental

cimento ribeirao

Cimento Ribeirão

cimento ribeirao

The Cia. Cimento Ribeirão belongs to the Votorantim Group, which is present over 20 countries.

foto-cimentos-ribeirao-foto-do-blog-freguesia.com

Master Ambiental developed a solid waste management plan and employee training for a factory, which covered the following aspects:

  • Decrease waste production;
  • Segregation;
  • Packing;
  • Identification;
  • Collection and transportation;
  • Temporary storage;
  • Internal treatment;
  • External storage;
  • External collection and transport;
  • External treatment and final disposal.

Know more about Master

VOTORANTIM

Votorantim

VOTORANTIM

 

The Votorantim Group is present in more than 20 countries, working in various economy sectors, including cement manufacturing.

Master Ambiental provided environmental consultancy and a solid waste management program for a cement factory, Cimentos Ribeirão, which belongs to the Votorantim Group.


Know more about Master